These walls are either constructed from concrete blocks or poured concrete.
How to finish poured concrete walls.
Space fasteners every 6 ft.
He spaces fasteners every 6 ft.
Applying finish is a process wherein the concrete wall is strengthened and prepared for being painted.
Phil fastens his walls to the floor with construction adhesive and a powder actuated tool pat.
First put construction adhesive on the floor then tip the wall into place and fasten with concrete nails or screws.
Stand on the stepladder to reach the highest points of the walls if necessary.
Saturate the scrub brush in the soapy water and wash the cement walls thoroughly with the soap to remove dirt and dust from the concrete surface.
This is a good size area to work in so the drying of the slurry does not go faster then your ability to rub out the wall.
Apply the slurry to your new concrete wall by holding the trowel blade to the wall so the slurry is pressed onto it and wiping the slurry across the wall with a smooth arcing motion.
Go for a solid color or get wild and.
Paint your cinder block 5 13 basement walls of cinder block brick or even poured concrete can be transformed pretty quickly and simply with a coat of paint.
For a really smooth finish repeat the troweling step two or three times letting the concrete harden a bit between each pass.
At first hold the trowel almost flat elevating the leading edge just enough to avoid gouging the surface.
Poured concrete wall average cost.
Allow the concrete to dry for approximately 30 minutes until most of the moisture is gone from the top.
Finish the surface of the wall as desired.
Drag the flat of the trowel straight across the surface of the concrete to smooth it.
Several factors determine the cost of a poured concrete wall such as the dimensions of the wall the thickness its height and its length the number of reinforcements present and the quality and type of concrete used.
And within 6 in.
You ll have to practice to develop a feel for it.
Concrete walls are commonly seen in households and commercial buildings.
As a material concrete is usually divided into concrete blocks and poured concrete walls.
Concrete walls have a tendency to absorb water i e.
Create contraction joints every 4 6 feet.
Pour footings and wall.
Troweling is one of the trickier steps in concrete finishing.
See below for more information on contraction joints remove forms and install waterproofing and drainage system.
Trowel a 3 8 inch layer of concrete over the wall with a straight trowel.
Evenly coat a 2 by 2 foot area.
Fill the bucket with warm water and add two or three squirts of dishwashing soap to the bucket.
If the wall exceeds four feet in height footings should be poured separately.