Ideally a ground should be zero ohms of resistance but.
Ground rod resistance requirement.
I do not know of an equivalent requirement in the british standards.
The nec and ul require a ground rod to be at least 8 feet in length.
On jobs where a building or structure.
Grounding and bonding transient voltages and currents at data port or cable connections voltage difference.
The length of a ground rod plays a much bigger role in its final ground resistance measurement and it goes without saying that it takes longer to drive a longer ground rod.
In practice for a residential structure most electricians place two ground rods and call it done.
Resistance of a single ground rod exceeds 25 ohms to ground and the metal underground water line is the only other available electrode an additional electrode must be installed.
This does not create the best ground but it meets the bare minimum of the code.
In areas where driving ground rods may be impractical the two point method can be used.
There is no requirement to retest the resistance.
In areas where codes require two ground rods because of high electrical resistance in the soil the rods must be spaced at least 6 feet apart and interconnected by a buried jumper wire.
If this is the case for your ground rod the best solution is to drive a different rod into a different location.
With this method the resistance of two electrodes in a series is measured by connecting the p1 and c1 terminals to the ground electrode under test.
For instance if a ground rod is driven into a very rocky and dry area it may not conduct electricity into the ground well.
Ground rod current source lightning average current 30 000 amps.
The nfpa and ieee recommend a ground resistance value of 5 ohms or less while the nec has stated to make sure that system impedance to ground is less than 5 ohms specified in nec 50 56.
Unfortunately there is not one standard ground resistance threshold recognized by all certifying agencies.
If this additional electrode is another ground rod it must be driven at least 6 away.
Find out why the national electrical code 25 ohms or less rule may have less to do with power quality than you think.
This requirement clarifies that the supplemental electrode system must be.
P2 and c2 connect to a separate all metallic grounding point like a water pipe or building steel.